(Deerfield, MA) The Green Infrastructure Design Plans for South Deerfield’s Leary Lot, off of Elm and North Main Streets, is reaching its final stages. The Berkshire Design Group has created a design to incorporate green space into the parking lot with a rain garden, raised planters, privacy plantings, along with electric Vehicle charging stations, a pedestrian plaza and a new access drive to the lot. There will be a final opportunity to provide comment on the design plans at the community-wide forum on Wednesday, December 13th at 5 p.m. in the Deerfield Town Offices.