NORTHFIELD, MA (FRANKLIN COUNTY NOW) — Work began this week on the Route 10 bridge repair project in Northfield, which involves repairs to the existing concrete bridge deck, existing bridge joints, as well as replacing the asphalt wearing surface.
Phase 1 of 3 is currently underway on the northern portion of the bridge and travel lanes are reduced to twelve feet in both directions.